Fbcc pu110
Eco-friendly Waterproof Self-leveling
Odorless, Eco-friendly, No Harm to the Builder Excellent Waterproof, Best Sealing, Bright Color Resistant to Oil, Acid, Alkali ,Puncture, Chemical Corrosion Single Component, Self-leveling, Ready to Use, Convenient Operation 600%+ Elongation, Super-bonding without Crack Resistance to Tear, Shifting, Settlement Joint
PROPERTY
Color
Density (g/cm³)
Tack Free Time (Hr)
Tensile Strength (Mpa)
Curing Speed (mm/24h)
Elongation at Break (%)
Solid Content (%)
Operation Temperature ( ℃)
Service Temperature ( ℃)
Shelf Life (Month)
FBCC PU110
White Color
Gray Color
Green Color
1.35±0.1
<12
>2
3 ~ 5
>800
>85
5-35 ℃
-40~+80 ℃
9
Applications
Waterproofing and moisture proofing for kitchen, bathroom, balcony, roof,gutter and so on. Anti-seepage of reservoir, water tower, water tank, swimming pool, bath, fountain pool, sewage treatment pool and drainage irrigation channel. Leak-proofing and anti-corrosion for ventilated basement, underground tunnel, deep well and underground pipe and so on. Bonding and moisture proofing of all kinds of tiles, marble, wood, asbestos and so on.
Preparation for Operation:
1. Tools : The serrated plastic board, brush, plastic barrels, 30Kg electronics, rubber gloves and cleaning tools like blade .etc
2. Environmental requirements:The temperature is 5~35 C and the humidity is35 ~ 85%RH
3. Cleaning:The substrate surface must be solid, dry and be clean. Such as no dust, grease, asphalt, tar, paint, wax, rust, water repellent, curing agent, isolating agent and film. Surface cleaning can be dealt with by removing, cutting, grinding, cleaning, blowing, and so on.
4. If there are cracks on the substrate surface, first step is to fill them, and the surface should be leveled. Operation after the sealant curing more than 3mm.
5.Theoretical dosage: 1.0mm thick, 1.3 Kg /㎡ coating needed.
Operation:
First Step: Brushing the part like corner, tubes root, then symmetrical scraping. The thickness of the coating is generally 0.5mm. (Avoid bubble). When operation,It should be considered about the size, shape and environment of the construction area.
Second Step: Symmetrical scraping when the coating is completely solidified (about 12 hours later). The thickness of the coating should be 0.7mm, and the direction of smearing should be perpendicular to the first time. The specific operation is the same as the first step.
Third Step: Symmetrical scraping when the coating is completely solidified (about 12 hours later). The direction of smearing should be perpendicular to the second time. The specific operation is the same as the first step.The operation times depends on the design thickness, the overall thickness is 2.0-2.2mm.
1. Protection: If necessary, a proper protective layer can be operated on the surface of the coating and self-leveling.
2. Tools Cleaning: It can be soaked in toluene or xylene. It is strictly forbidden to immerse in alcohol and other alcohol solvents. If it is not used for a long time, it should be cleaned immediately with alcohol or other organic solvents. The cure glue can only be scraped or torn off.
Attention of Operation :
1. Don’t mix alcohol into the product, it will cause the product invalid. The tools with the alcohol can’t be used before cleaning well.
2. The total coating thickness is around 2.0mm, special parts should be more than 2.0mm.
3. Attention: Do not apply more than 1.5mm thickness FBCC PU110 per coat for layers .
4. Avoid water, pollution and damage before tack free time of the coating, prohibit any operation before full curing (about 24Hrs).
5. Ventilated environment is required as operating, and some necessary safety precautions should be taken. During operation, records should be filled in truthfully. For special projects, follow the construction description strictly.
6. Avoid contact with eyes and skin. If contact with your skin, scrub first with soap water or alcohol, then rinse with water. If contact with your eyes, rinse with plenty of water, and
seek medical treatment immediately.
7. It is forbidden to build on the surface of the wet substrate.
8. Transportation: Avoid damp, high temperature,isolation and rain, far away from heat, handle with care and prohibit extrusion collision.
Warranty and Liability:
All product properties and application details based on information believe to be reliable and accurate. But you still need to test its property and safety before application. The advices we supply don’t apply in any circumstances. SEPNA don’t make assurance of any other applications outside the specification until SEPNA supply a special written guarantee. SEPNA is only responsible to replace or refund if this product is defective within the warranty period stated above. SEPNA makes it clear that will not be liable of any accidents.
PROPERTY
Color
Density (g/cm³)
Tack Free Time (Hr)
Tensile Strength (Mpa)
Curing Speed (mm/24h)
Elongation at Break (%)
Solid Content (%)
Operation Temperature ( ℃)
Service Temperature ( ℃)
Shelf Life (Month)
FBCC PU110
White Color
Gray Color
Green Color
1.35±0.1
<12
>2
3 ~ 5
>800
>85
5-35 ℃
-40~+80 ℃
9
Applications
Waterproofing and moisture proofing for kitchen, bathroom, balcony, roof,gutter and so on. Anti-seepage of reservoir, water tower, water tank, swimming pool, bath, fountain pool, sewage treatment pool and drainage irrigation channel. Leak-proofing and anti-corrosion for ventilated basement, underground tunnel, deep well and underground pipe and so on. Bonding and moisture proofing of all kinds of tiles, marble, wood, asbestos and so on.
Preparation for Operation:
1. Tools : The serrated plastic board, brush, plastic barrels, 30Kg electronics, rubber gloves and cleaning tools like blade .etc
2. Environmental requirements:The temperature is 5~35 C and the humidity is35 ~ 85%RH
3. Cleaning:The substrate surface must be solid, dry and be clean. Such as no dust, grease, asphalt, tar, paint, wax, rust, water repellent, curing agent, isolating agent and film. Surface cleaning can be dealt with by removing, cutting, grinding, cleaning, blowing, and so on.
4. If there are cracks on the substrate surface, first step is to fill them, and the surface should be leveled. Operation after the sealant curing more than 3mm.
5.Theoretical dosage: 1.0mm thick, 1.3 Kg /㎡ coating needed.
Operation:
First Step: Brushing the part like corner, tubes root, then symmetrical scraping. The thickness of the coating is generally 0.5mm. (Avoid bubble). When operation,It should be considered about the size, shape and environment of the construction area.
Second Step: Symmetrical scraping when the coating is completely solidified (about 12 hours later). The thickness of the coating should be 0.7mm, and the direction of smearing should be perpendicular to the first time. The specific operation is the same as the first step.
Third Step: Symmetrical scraping when the coating is completely solidified (about 12 hours later). The direction of smearing should be perpendicular to the second time. The specific operation is the same as the first step.The operation times depends on the design thickness, the overall thickness is 2.0-2.2mm.
1. Protection: If necessary, a proper protective layer can be operated on the surface of the coating and self-leveling.
2. Tools Cleaning: It can be soaked in toluene or xylene. It is strictly forbidden to immerse in alcohol and other alcohol solvents. If it is not used for a long time, it should be cleaned immediately with alcohol or other organic solvents. The cure glue can only be scraped or torn off.
Attention of Operation :
1. Don’t mix alcohol into the product, it will cause the product invalid. The tools with the alcohol can’t be used before cleaning well.
2. The total coating thickness is around 2.0mm, special parts should be more than 2.0mm.
3. Attention: Do not apply more than 1.5mm thickness FBCC PU110 per coat for layers .
4. Avoid water, pollution and damage before tack free time of the coating, prohibit any operation before full curing (about 24Hrs).
5. Ventilated environment is required as operating, and some necessary safety precautions should be taken. During operation, records should be filled in truthfully. For special projects, follow the construction description strictly.
6. Avoid contact with eyes and skin. If contact with your skin, scrub first with soap water or alcohol, then rinse with water. If contact with your eyes, rinse with plenty of water, and
seek medical treatment immediately.
7. It is forbidden to build on the surface of the wet substrate.
8. Transportation: Avoid damp, high temperature,isolation and rain, far away from heat, handle with care and prohibit extrusion collision.
Warranty and Liability:
All product properties and application details based on information believe to be reliable and accurate. But you still need to test its property and safety before application. The advices we supply don’t apply in any circumstances. SEPNA don’t make assurance of any other applications outside the specification until SEPNA supply a special written guarantee. SEPNA is only responsible to replace or refund if this product is defective within the warranty period stated above. SEPNA makes it clear that will not be liable of any accidents.