The park

Polish Floor Parking, Polishing Concrete

project schedule

  • Start date : Jan 2018.
  • End date : March 2018.

project location

Boeung Snow

Type of pu epoxy

  • Grinding
  • surface 3step
  • Repair surface fill the void
  • Start Polishing 5step.

Picture17
Picture18
Picture19

The park

Polish Floor Parking, Polishing Concrete

project schedule

  • Start date : Jan 2018.
  • End date : March 2018.

project location

Boeung Snow

Type of pu epoxy

  • Grinding
  • surface 3step
  • Repair surface fill the void
  • Start Polishing 5step.

Picture17
Picture18
Picture19

Project Reference

Tribe Hotel ( LBL )

AEON Mall2 Water Park

Penth House Residence

Villa

Beltie Group

AEON Mall2 Water Park